搜索
Tel

Hotline: 400-027-1230

News Center

Current location:
Homepage
/
/
/
Jindian Technology successfully shipped a set of transformer comprehensive test system for Shandong customers
Check category

Jindian Technology successfully shipped a set of transformer comprehensive test system for Shandong customers

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2022-12-19 09:58
  • Views:

(Summary description)

Jindian Technology successfully shipped a set of transformer comprehensive test system for Shandong customers

(Summary description)

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2022-12-19 09:58
  • Views:
Information

    Recently, a set of transformer comprehensive test system customized by our company for customers has successfully completed the quality inspection work, and has been quickly shipped to the customer site!

                                   

    NR8200A transformer comprehensive test system conforms to GB/T4776, GB/T5169, GB/4285-1993 and other relevant national standards.

    The transformer comprehensive test system is a special equipment designed and produced for transformer routine test, partial type test and special test according to customer requirements, using PLC as the control core and industrial control computer as the human-computer interaction interface.

    With the automatic test capabilities of air, load loss measurement and induction withstand voltage, all test items can be carried out by the comprehensive test software operation of demand-side transformers and related transformers. It has the advantages of high reliability, intuitive interface, simple operation and perfect protection measures.

    It is mainly composed of experimental operation table, test control system, test measurement system, test software, database and test report.

    The system adopts manual and PLC computer automatic control integrated design to realize the hand-to-function switching.

    Measurable items: rms value of three-phase voltage; RMS three-phase current; three-phase active loss; three-phase reactive power loss; three-phase average voltage; Three-phase voltage average; three-phase current average; total power; percentage of no-load current; Impedance voltage percentage; Frequency; Factor; Power frequency withstand voltage test; Induction test.

    Recently, the epidemic has raged, but many of our colleagues are still at work, making every effort to ensure the supply of equipment and provide timely services to customers. As long as you need, we will serve you wholeheartedly!

Recommended
news

RECOMMEND NEWS

Add

ADD:Building c3-09b, optical valley core center, 303 Optical Valley Avenue, Donghu New Technology Development Zone, Wuhan, China

Tel

Hotline:400-027-1230
Tel:+86-27-87690177

        +86 188 2742 2008

        +86 177 6240 6910
After sales:

        +86-177 0277 9566

        +86-133 6724 1932